Finished parts are moved to the final inspection and packing area where they are removed from the fixtures and inspected. Inspection criteria is per each customer’s standard for that individual part, and according to their own requirements, following ISO 9001:2000, ISO TS 16949, and AS 9100 guidelines. |
|
|
A tracking tag is included in every box to ensure traceability of parts throughout the entire process. Parts are then packed for shipment according to customer’s specifications. |
|